MEMBER SIGN IN
Not a member? Become one today!
         iBerkshires     Berkshire Chamber     Berkshire Community College     City of Pittsfield    
Search
Berkshire Health Systems Announces Paving at BMC Main Entrance
10:15AM / Sunday, September 03, 2023
Print | Email  

PITTSFIELD, Mass. — Berkshire Health Systems (BHS) announced blacktop removal and paving at the main entrance of Berkshire Medical Center as part of the ongoing mechanical infrastructure work at the neighboring Medical Arts Complex (MAC).  
 
On Tuesday, Sept. 5, contractors will remove blacktop from the northbound lane of the main driveway entrance to the hospital at 725 North Street. Traffic will move to the southbound lane at various points during the day. Paving will take place on Wednesday, September 6, and similar traffic restrictions will apply.  
 
Flaggers will be onsite for both days to manage traffic while the work takes place. Please allow extra time when using the hospital's main entrance. 
Comments
More Featured Stories
Pittsfield.com is owned and operated by: Boxcar Media 106 Main Sreet, P.O. Box 1787 North Adams, MA 01247 -- T. 413-663-3384
© 2008 Boxcar Media LLC - All rights reserved