MEMBER SIGN IN
Not a member? Become one today!
         iBerkshires     Berkshire Chamber     Berkshire Community College     City of Pittsfield    
Search
BHS Implementing Temporary Parking Changes at Medical Arts Complex
07:50AM / Monday, February 24, 2025
Print | Email  

PITTSFIELD, Mass. — As part of the continuing construction work at the Medical Arts Complex (MAC) in Pittsfield, Berkshire Health Systems (BHS) has announced temporary parking modifications to accommodate work on the MAC's main parking area.

These changes will ultimately result in a more convenient and larger lot for patient parking.

The number of spaces will increase by nearly 100, and parking will be available at a flat grade, rather than on a hill, as in the previous lot. The parking changes will impact Medical Arts Complex patients and BHS staff and are estimated to last until mid-spring.

Effective Monday, March 3, 2025, the main patient parking lot on the eastern side of the MAC building (previously accessed through the Charles Street driveway) will be closed until further

notice. Patient parking will be relocated to a marked BHS parking lot on Charles Street directly across from the entry to the MAC main lot. Currently this space is being used as parking for

employees, who will be redirected to other existing staff parking areas.

The patient shuttle bus will relocate to the entryway at the temporary patient parking area. BHS Safety & Security will be on-site during the first week of March assisting with the new traffic flow and signage will be posted delineating the parking changes.

A map outlining the temporary parking changes can be found on the Berkshire Health Systems website.

Comments
More Featured Stories
Pittsfield.com is owned and operated by: Boxcar Media 106 Main Sreet, P.O. Box 1787 North Adams, MA 01247 -- T. 413-663-3384
© 2008 Boxcar Media LLC - All rights reserved